Skip to content

Hardware test candidates

T2B1 and T3B1 development images must come from the same identified clean source commit, with full CI and reproducibility checks. A candidate bundle associates each .bin with SHA-256, SBOM and provenance naming the source, CI run and executed software checks. Use the selected candidate or release bundle, not unrelated older images in dist/.

  1. Identify T2B1/T3B1 precisely and read installation and its irreversible effects.
  2. Verify candidate SHA-256 before installing. Images use public upstream development signing keys and retain the mandatory unsafe warning; these are not private distribution signatures.
  3. Execute R01–R16 on both revisions, recording model, image hash, OS and evidence. Include MSC copies, both QR profiles, cross-revision restore and power interruptions.

32-bit host probes and emulators provide software evidence. They do not verify physical USB, OLED/camera readability or real MCU peak RAM. The initial partial T2B1 campaign does not complete the acceptance procedures. Stable publication requires the release checklist.